6)
39
feet in length through Smugglers Ridge and the South
Tunnel 4,689 feet in length through Golden Hill
were completed, and so also was the reservior with a capacity of 33 million gallons in the lower Shek-lai-pui valley, built to receive raw water
delivered through these tunnels. In the following
This
year 150 feet of the North Tunnel were straightened
and 3,200 feet of 24" steel main were laid.
trunk main will bring the Sheng-mun water to Kowloon
Point and will have a total length of 24,030 feet
with a feed to the Kowloon distribution system at Pipers Hill, where a covered reinforced concrete service reservior with a capacity of 14 million
gallons was completed in 1925. Immediately below the reception reservoir in the lower Shek-lai-pui
valley is the site of a rapid gravity filtration
plant to deal ultimately with 20 million gallons a
day. The first section of this plant, capable of
filtering five million gallons a day has already been
completed and is now in operation. Adjoining these
filters, there is under construction a covered
reinforced concrete service reservoir with a capacity
of eleven million gallons".
In order that the water from the Sheng-mun
scheme may be available on Hong Kong Island, further
works estimated at cost $361,602 must still be
completed, including a pipe-line across the harbour
described in the Memorandum circulated with C.D.A.C.31
(2) Estimated Total Cost.
(a) Aberdeen Scheme
Developments of Scheme $2,177,000 Resumption and
Salvage
525,000
$2,702,000